Power System Maintenance Evaluation
MPS has a program to evaluate and maintain the integrity of the power system from top to bottom, a head to toe approach. The program areas include the following:
Delivery Point Substations – Where power is received from TVA:
- Maintenance and testing of transformers, breakers and battery systems
- TVA loss control and verification
- Oil testing of major transformers
69kV Transmission System:
- Pole and line inspection every five years
- Vegetation management to assure right of ways are cleared every three years
Distribution Substations:
- Maintenance of transformers and load tap changers
- Oil testing of transformers
- Maintenance and testing of breakers and battery systems
- Testing of TVA revenue meters
- Semi-annual infrared testing of switches, arrestors and transformers
Primary Distribution (13.2kV) System:
- Recloser and capacitor inspection every three hours
- Pole base survey & treatment (ten year cycle)
- Overhead primary line inspections (ten year cycle)
- Operations testing of 3-phase disconnect switches (five year cycle)
- Semi-annual infrared testing of switches, capacitors, arrester, underground transitions and transformers
- Vegetation Management to assure Right of Ways are cleared every three years
Customer Meters:
- Residential meters – test every ten years
- Demand meters – test every five years
- Primary meter installations (larger customers) – test every three years